← Engineering projectsProject 09 / 10
Energy efficiency & operational development

Compressed-dry-air standby proposal

Developed a compressed-dry-air standby-mode proposal for low-demand operation. Reviewed equipment constraints and implementation requirements with operations, contractors and central engineering.

Responsibility
Proposal development and engineering coordination
Context
Motherwell & Grangemouth operations placement · 2024–2025
Standby modeproposal developed for low-demand operation
Results and scope
Engineering project index
Engineering approach

Connected the low-demand operating proposal with equipment limitations and implementation input from operations and engineering stakeholders.

01 / Objective

Objective and context

Assess an operating approach for compressed-dry-air supply during periods of low demand. The proposal needed to account for equipment constraints and the requirements for practical implementation.

02 / Contribution

Technical contribution

  1. Operating proposal

    Developed the standby-mode proposal for periods of low demand, focusing on the relationship between operating requirement and compressed-dry-air equipment use.

  2. Constraint review

    Reviewed equipment constraints and the requirements that would need to be addressed before implementation.

  3. Implementation coordination

    Worked with operations, contractors and central engineering to review the proposal and its implementation requirements.

03 / Results

Results and scope

Produced an energy-efficiency proposal with equipment and implementation constraints considered through cross-functional review.

Scope of responsibility and evidence

Proposal-stage work, with equipment constraints and implementation requirements reviewed.

Tools and methods

  • Energy-efficiency assessment
  • Equipment constraints
  • Operational review
  • Contractor coordination
  • Central engineering
Professional enquiries

Contact Kevin Muleya